Cajun was contracted to drill and pour 102 drill shaft foundations ranging from 24” – 60” in diameter and from 12’ – 30’ deep for a new substation in Arkansas.

Statistics

  • 8 month duration
  • 1,972 man-hours
  • 14 peak manpower

Work Performed

  • Drill, temporary case, and pour the shallower foundations
  • Drill, slurry, and pour the deeper foundations
  • Set full-length reinforcement cages
  • Set anchor bolts
  • Form and pour above grade caps